Coronavirus: Dealing with it under NEC and JCT contracts

Recording

This webinar was delivered on 25 March 2020 by William Brown, a qualified civil engineer and leading construction lawyer at Quigg Golden. All information contained therein was correct at time of delivery.

Coronavirus and NEC / JCT Contracts

The webinar is designed to provide an overview of how the coronavirus outbreak should be dealt with under NEC and JCT contracts.  Time will be taken during the webinar to explain:

  • The legal concepts of ‘force majeure’ and ‘frustration’;
  • The notification requirements of the NEC and JCT contracts;
  • The importance of record keeping in the coming months; and
  • The contractual mechanisms under NEC and JCT for assessing Contractor claims.

Construction professionals working from home, the office or on site are encouraged to log into this this webinar to ensure that they are equipped with the knowledge they need to face the challenges of the months ahead.

Click here to watch webinar

The powerpoint presentation can be downloaded here.